| Goal and scope | To evaluate the marginal abatement cost (MAC) of alternative electricity procurement strategies (F1 & F2) for public wastewater reuse systems under increasing PPA penetration. |
| Studied system | WWTP coupled with MBR + UF/RO Reuse-water system (22,000m3/day) |
| Studied scenarios | PPA penetration (0–80%); Operation mode (F1: WWTP-coupled, F2: VRE-following); Total scenarios (n = 9) |
| Functional unit | 1 m3 of reuse water |
| Location | Jeju |
| System boundary | Cradle-to-Gate (operational phase) |
| Temporal resolution | Hourly (8,760 hr) |
| PPA contact price | 186.7(KRW/kWh) |
| Assessment methods | GHG emission intensity (CO2/m3), Water unit cost (KRW/m3) |