Table 1. Summary of goal & scope definition

Item Information
Goal and scope To evaluate the marginal abatement cost (MAC) of alternative electricity procurement strategies (F1 & F2) for public wastewater reuse systems under increasing PPA penetration.
Studied system WWTP coupled with MBR + UF/RO Reuse-water system (22,000m3/day)
Studied scenarios PPA penetration (0–80%); Operation mode (F1: WWTP-coupled, F2: VRE-following); Total scenarios (n = 9)
Functional unit 1 m3 of reuse water
Location Jeju
System boundary Cradle-to-Gate (operational phase)
Temporal resolution Hourly (8,760 hr)
PPA contact price 186.7(KRW/kWh)
Assessment methods GHG emission intensity (CO2/m3), Water unit cost (KRW/m3)